Buffing completed and hardware installation underway.
Soldering leads to the input jack.
Input jack installed.
Finished recessed input jack.
Installed dedicated volume knobs for each pickup as well as a concentric knob (bottom of the knob controls bass and the top controls treble) for the on board preamp.
Wiring so far. Waiting on a switch before I can finish up the electronics and test it out.
Nut blank in place. Still have to file the string slots and shape the nut.
Barring any issues with parts being shipped or electronics giving me a hard time this should be finished up within the next week or so.
Subscribe to:
Post Comments (Atom)
1 comment:
Nice Job Jerry!!!
Squeak
Post a Comment